Construction Oversight
EPSYS performed construction management to finalize construction operations for a 1.4 mgd treatment facility. EPSYS coordinated with the subcontractor for the construction of the system as well as for scheduling, pricing, and subcontractor payment.

EPSYS was also retained for permit negotiations, development of a conceptual and detailed design, and installation of a pretreatment system for metal plating wastewater. Building foundations, collection basins, storage tanks, drain lines, and a treatment system were all installed within the established four month construction schedule.